Structural Work Process

  1. We begin with a detailed inspection of the existing structure, identifying any weaknesses, movement, cracks, or load issues before works start.

  2. Our structural engineers carry out load calculations, soil checks (if required), and prepare safe solutions that comply with UK building regulations.

  3. We prepare drawings, submit to Building Control, and liaise with surveyors. All approvals and permits are obtained before work starts.

  4. Before removing or altering any structural element, we install strong props or scaffolding to ensure stability and site safety.

  5. We carefully remove non-load bearing parts, cut openings, and prepare foundations or pockets for new steel beams, pads, or underpinning.

  6. We install beams, RSJs, lintels, and reinforcements exactly to spec—aligned, level, and securely bolted or welded into place.

  7. Once permanent structures are in place, we gradually transfer loads, checking settlement and removing temporary supports safely.

  8. We complete a full inspection with you and Building Control. Certificates, warranties, and as-built drawings are provided for records.